Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Nov 16, 2022     Primed inside of baggage door - (0.8 hour)       Category: Baggage Door
1. Sanded the filler on the top and bottom edges of the baggage door.
2. Roughed and cleaned the door surfaces.
3. Primed the inside of the door.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.